Project Description

SSI was contracted to do targeted envelope repairs for this Seattle association. The targeted repairs included removing all of the entry concrete stairs and installing new wooden framed entries to eliminate the original construction defect that was causing substantial framing decay. The EIFS on the lower portion of the building was removed and replaced with matching siding.